Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox

Product Details
Customization: Available
After-sales Service: Long Term
Warranty: Long Term
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Self-branded
The supplier has 5 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 5 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (25)
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
  • Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Product Parameters
Overview

Basic Info.

Model NO.
MESK, ESSK, RSK
Temperature
1400ºC
Refractory
Fibre
Product
Silicon Carbide Crucibles
Product1
Clay Graphite Crucibles
Transport Package
Overseas Standard
Specification
Trademark
LinkconKilns
Origin
China
Production Capacity
100

Product Description

Product Description

 

Moving Hood Kiln

Linkcon Thermal Technology provides heavy-duty moving hood kilns for heavy loads (Graphite Crucibles and so on).

This kiln is an excellent alternative for heavy loads placed in several stationary bases, and moving hood kiln is travelling to the required heating station or simply when it is easier to move the kiln than the load.

 

 
Our Advantages

 

Kiln Features:
  1. Pulse firing systems
  2. The most advanced heat recovery systems with recuperative/regenerative burners performing fuel savings 10%-50% vs cold air system
  3. Fiber lined sections using the special design to compensate the fiber shrinkage reducing the maintenance considerably
  4. Heavy-duty refractory base designs with high resistance to thermal shock
  5. Each burner is equipped with flame monitoring and safety measures to comply with EU EN746-2 gas service standard
  6. Equipped with remoted monitoring system to check the kiln status at any time
  7. Reliable hydraulic system for hood movement
Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and NoxClimateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and NoxClimateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
TECHNICAL SPECIFICATION OF KILN
 
Product Parameters

 

No. OF KILNS: One  
TYPE OF KILN: Moving Hood Intermittent Kiln with Horizontal Afterburner and Down Draught System  
MAXIMUM WORKING FIRING TEMP:
Max Soaking Time at Max Operating Temperature:
Firing Mode:
1400°C (Design Safety factor to be included)
150 Minutes (Design Safety factor to be included)
Normal and Regenerative
 
TEMPERATURE UNIFORMITY: ±5°C throughout the kiln at soak (Note:  Measuring area should be outside the crucible and 150mm above floor level to top of crucible)in the useful loading area only  
ATMOSPHERE: Oxidizing at adjustable range of 0 to 5%.   
FUEL:  LPG, 2 staged regulator 4kg  to 1 kg /CM2  
ELECTRICAL SUPPLY: 415V(+/-10%) Three Phase and Neutral  
KILN USFELU VOLUME: 69.3m³  
KILN USEABLE NTERNAL DIMENSIONS: 6000(3 hearth  x2000)*3,500*3,300mm (L*W*H)    
KILN USEABLE EXTERNAL  DIMENSIONS: 9200*5600*4800mm (To be Finalized during GA drawing Review) 
Lining thick ness 350 mm to be reviewed with Fibre vendor based on the Design of LTT
 
KILN AFTER BURNER SYSTEM DIMENSIONS: 8000*1600*1600mm(To be Finalized during GA drawing Review)  
KILN OVERALL WEIGHT Approx 60TON (Inclusive of all with Lining moisture)  
MAXIMUM WEIGHT
OF WARE PER FIRE:

VOC Flue gas burning- Modulating Control:
Direct Load (SIC/ CG) : 10 MT
Indirect Load or Product Load with Saggers : 24MT
After burner about 800ºC-850ºC
After burner in operation from start of cycle to 850 Deg or 900 Deg .
 
KILN FIRING CYCLE: Indirect Firing 1260mins (CG/SiC)
Direct Firing 230mins (SiC)
Direct Firing 2880Min(CG)
As per Program cycles program can be fed into the system
Very slow heating rate at the rate 40 deg/Hr can be achieved
No sudden rise of temp inside kiln during slow heating cycles
 
KILN LINING:  Kiln lining - 350MM and after burner is 150~200MM. Max allowed skin temperature is RT + 30  Deg  
KILN HEARTH: 2 Hearths with Flue Port and Exhaust passage Refractory Hearths Material specifications  
T/C IN KILN:
 
8 set -control / over temp.  Duplex type . Specifications of shields and 'R' type thermocouples  
T/C IN A/B: 1 - control /1- over temp Duplex type, Specifications of  "K" Typ  
     
T/C IN REGENERATIVE BURNER EXHAUST 8 monitor, specification  K type  
Zone wise control: Independent or Multiple Control Zones Technology  
     
KILN BURNERS: 16 - 420kw rated Epsilon high velocity Regenerative Burners, complete with refractory flame brick, spark ignition and uv sensors
Detail drawing to be shared before procurement. ENERGY SAVING of 30-35% SAVING can be achieved through Regenerative burners(Compared during Regenerative Mode only)
 
Products Sintering LTT AssurE correct Product Sintering For Direct & Indirect Firing Cycles as agreed  
AFTERBURNERS: 6   -- Epsilon hot air burners for modulating control with sic tubes, spark ignition and uv sensors.  
     
HEATING SYSTEM: Pulse Fired system, and flameless flame over 850ºC
8 Zone control
 
PROGRAMME/CONTROL: LTT E-smart System:  Remote control available, Alarm messenger to appointed person.
Cabinet comply to IP65
PLC based control system comprising of:-
Kiln Mounted control panel containing a colour touch screen (15" High Brightness) and integrated computer including Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and NoxSCADA system and kiln over temperature controller, the touch screen will act as the main user interface.
The screen allows programming of kilns firing cycles and provides real time and historic time reading, stamped plant alarms.
PLC to be Allan Bradley.  
Emergency switches to be provided in all Electrical Panels
All displays and control systems should be in English

 
 
Access Control Programmer Controllers with password Protection ,All Instrumentation Where Ever Applicable  
Kiln Pressure Control system Auto Two pressure transducers to monitor and record the pressure in the kiln chamber.  
Electrical and LPG connections to Hood: LPG Flexible Hose connection as Kiln hood is moving. Electrical Cables with Flexible cable tray to avoid damages to cabling and short circuit LPG hose pipe and electrical cable tray must be separate  
Regenerative mode: Regenerative, High Velocity, Pulsed Firing which is run until the volatile gases finish coming out to avoid the regen box damage caused by the maybe partial overheat, now the system is most efficient compared with other system . when the kiln run at 1400ºC the benefit from our flameless flame can be selected above 850ºC,the products will be not affected by high regenerative burners is that combustion air will be preheated up to 1000ºC, flameless flame can be selected above 850ºC,the products will be not affected by high temperature flame and very good temperature distribution.
Flexibility for direct & indirect-For Better Energy saving. Heat recuperator for Kiln Burners in Normal Firing mode. --Only for After Burners.
 
     
SAFETY INTERLOCKS: The gas supply to the kiln is automatically shut off in accordance with EN746-2:-
1.  High gas pressure.
2.  Low gas pressure.
3.  Low air pressure.
4.  Over temperature setting is exceeded.
5.  Loss of electrical power to kiln.
6. Over kiln pressure 
7. Door Unlock
8. Kiln Not in hearth position
9. Regen box over temperature
 
 
Main Gas Train Safety: Pressure operated vent valve Sinon)Pressure operated vent valve (Sinon)
2 NOS-Solenoid safety shut off valve (Sinon)
1 Valve Passing System/Gas leak detection system
 
After Gas Burner system Pressure operated vent valve (Sinon)Pressure operated vent valve (Sinon)
2 NOS-Solenoid safety shut off valve (Sinon)
 
 
Each Burner
with 2 solenoid valves for LPG
16 sets of Solenoid valves and flow manual valves  
Joint Safety Gas Piping Joints
with Standard Copper Jumpers
 
 
STANDARD TO BE FOLLOWED Manufacture the kiln as European standards  

CONSTRUCTION:
   
Kiln Structure: Fabricated steel frame externally clad.
Kiln to be manufactured in sections for ease of delivery to site.
Kiln Plate should be 304 ss.
 
Kiln Sheets material: SS 304,Kiln Plate should be 304 ss.  
Hood Type: Moving Hood with 2 side Doors  
Kiln Hood Lifting and Lowering: Hydraulic Driven  
Kiln Hood Movement: Hydraulic Driven  
Kiln Both Sides Doors
Open and Locking:
Manual type for swing door to close and open 
automatic lock by safety unit
 
Kiln Side Cooling PANELS Made by galvanize sheet  
Kiln top access safety Standard height railing and access ladder to be provided  
     
Rails & Channels Std.Rail with  C channels  
Hydraulic Power Pack position Provided on side of the hood  
     
DAMPERS: The kiln is of a down draught design and incorporates
2- Slide damper for each flue path of both hearth to open/close automatically. Damper Guide and Door - 310SS
 
Air Fluel Ratio Auto adjusted and can be remotely controlled,LTT Confirm Auto Air/Fuel ratio Adjustment  
FANS: Noise Level less than 85db tested (1 meter away) .  
All motors by Siemens, comply to IE3
Including:
One kiln combustion fan mounted on the kiln roof
One afterburner combustion fan mounted next to the afterburner
One exhaust fan                                                                                                   To reduce further noise levels of blowers Silencer to be applied
 
INVERTERS ABB  
  Control system comprising of a Rittal control panel containing instrumentation control, and kiln over-temperature controller linked to a computer with Scada software acting as the man/machine interface wired to EU colour regulations. Panel A/C included.  
OXYGEN LEVEL Measured by Oxygen Analyzer Yokogawa / NOVATECH, monitor and send signal back PLC (designed to avoid damage by the flue gases below 850ºC, Note: the reading before the resin finish coming out should be not used for proper reading)
Climateguard Ecokiln Moving Hood Kiln with Regenerative System for Reduced CO2 and Nox
 
HEAT EXCHANGER One heat exchanger will be mounted after the afterburner for preheating the afterburners  
CHIMNEY 18m high from floor level.  Upper parts 6mm thick roll plate, bottom 8mm thick roll plate.  
COOLING Inject from 16 burners and exhaust from the path under the floor . Ref Volume 10800m³/Hr-14000m³/hr  
Gas Meter for Kiln: (China Brand Xun'er) Specifications
Mass flow/range--must count in minimum consumption also. & LPG Consumption/cycle theoretical for Direct & Indirect firings to be confirmed during design phase
 
Cold to Cold Cycle time: Cooling time to be below 8 hours to get to 400degree from max temperature
Reconfirm heating +cooling time & Both end Provision for Cooling system railing/channels. During design phase
 
     
Exhaust Connections-Regen Exhaust Connections for Regen system will be atomized  
Drawings and documentation All Drawings of Civil/Electrical/Hydraulics/Mechanical/fabrication/Ladder diagram in English with Commented Programme/Soft Copies also etc
Two sets of kiln instruction manual\maintenance manuals
 
Guarantee for a period of 12 months from date of first production firing,
Burner refractory working life will be 3.5 years for indirect firing
 
Emmission Level:  match Local Govt.
Rules of Pollution Control Board
 
System Confirmity/Standards LTT To Confirm --Like NFPA 86,EN 60204-1{SAFETY OF MACHINERY.ELECTRICAL EQUIPMENT OF MACHINES GENERAL REQUIREMENTS,GB/T116618-1996  
Training LTT provide necessity training  
Ceramic Industry Atmosphere LTT To Confirm and Consider Dust,Indian Atmosphere Dry & Hot.  
All parts of Kiln system  make, easy availability in indian market International brands should be first option.
(electrical and general parts if necessary)
 
Equipment Running/Maintaining cost Running cost will be gas/ electricity consumption depends on firing
Maintenance cost will be regularly inspecting burners balls/bricks
and kiln seals with floor
 
Safety related during supply and installation and commissioning. Method statement /JSA Will be prepared on site and accordingly will be followed. All MCIL EHS Requirements LTT To Fulfill.  
MACHINE GUARDING All Moving PARTS must have 360 Deg. Guarding  
Compensators & Vibration
 dampers /pads
where if necessary.  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier